挣值法在工程项目成本管理系统中的应用与实现(3)

来源:南粤论文中心 作者:乌云娜 陈健 李泽众 发表于:2013-02-06 17:09  点击:
【关健词】挣值法;工程项目;成本控制;挣值曲线;评价指标
参考文献: Attarzadeh I, Hock O S. A new forecasting model to improve earned value index to achieve an accurate project time and cost estimation [J]. International Conference on Information Manageme

参考文献: 
Attarzadeh I, Hock O S. A new forecasting model to improve earned value index to achieve an accurate project time and cost estimation [J]. International Conference on Information Management and Engineering, 2009: 317?321. 
Hanna, Awad S. Using the earned value management system to improve electrical project control [J]. Journal of Construction Engineering and Management, 2012, 138(3): 449?457. 
Jose L P-T, Eugenio P, Victor Y. Complete fuzzy scheduling and fuzzy earned value management in construction projects [J]. Journal of Zhejiang University-Science, 2012, 13(1): 56?68. 
Kim Byung-Cheol, Reinschmidt Kenneth F. Combination of project cost forecasts in earned value management [J]. Journal of Construction Engineering and Management, 2011, 137(11): 958?966. 
张洁. EVM挣得值原理在工程总承包项目费用管理中的应用研究[J]. 工程项目总承包, 2006(5): 21?24. 
肖丽. 工程项目成本挣值管理法简介[J]. 公路, 2006(8): 146?149. 
李瑞, 刘玉君, 张帆, 等. 基于风险挣值的项目成本绩效评价方法研究[J]. 大连理工大学学报, 2011, 51(2): 298?303. 
程言家, 孙涛. 基于挣值的项目成本与进度的集成控制研究[J]. 工程项目管理, 2006(12): 98?101. 
李晓华. 基于挣值法的施工成本控制研究[J]. 科技信息, 2011, (12). 
李强, 张静. 基于挣值管理的项目工期成本优化分析[J]. 煤炭工程, 2007(4): 100?103. 
周津慧, 易海峰, 姜楠, 等. 挣值法在软件项目成本和进度监控中的应用[J]. 系统工程与电子技术, 2006, 28(4): 607?610. 
黄玮. 挣值法在工程项目成本控制中的应用[J]. 科技广场, 2009(4): 171?174. 
梁恒, 刘洪峰. 基于挣值法的成本管理模式分析[J]. 庆科技学院学报(社会科学版), 2009(12): 106?107. 
Application and Implementation of Earned Value Method 
in Project Cost Management System 
WU Yunna, CHEN Jian, LI Zezhong 
(School of Economics and Management, North China Electric Power University, Beijing 102206, China) 
Abstract: Cost control is one of the three control objectives in project engineering. Earned Value Method is an effective method of cost control. Based on the application of contract management, estimate management and project investment analysis module in the project cost management system this paper, calculates and disposes the three cost value in Earned Value Method through system database design and algorithm design, and describes the Earned Value curve, realizes the application of Earned Value Method in cost management system, thereby achieves the decision support functions of conducting comprehensive analysis and predicts to the project cost operation situation. 
Key Words: Earned Value Method; Project; Cost Control; Earned Value Curve; Evaluation Index a

(责任编辑:南粤论文中心)转贴于南粤论文中心: http://www.nylw.net(代写代发论文_毕业论文带写_广州职称论文代发_广州论文网)
顶一下
(0)
0%
踩一下
(0)
0%


版权声明:因本文均来自于网络,如果有版权方面侵犯,请及时联系本站删除.